Inicio
/
News
/
RENOVA SRL installs 20kW grid-tie system at TRANSTUR Cienfuegos, demonstrating capability in high-complexity projects

RENOVA SRL installs 20kW grid-tie system at TRANSTUR Cienfuegos, demonstrating capability in high-complexity projects

Cienfuegos – The technical team at RENOVA SRL has once again demonstrated their high level of expertise by successfully completing the installation of a grid-tie system at the TRANSTUR Cienfuegos Transport Base, a project that demands rigorous technical knowledge and precise execution.

The installed system consists of:

  • GoodWe 20kW inverter (ideal for grid-tie applications)

  • 18 solar panels of 585 watts

This type of installation, known as a grid-tie system, allows the energy generated by the panels to be injected directly into the electrical grid, optimizing economic savings and contributing to the entity’s energy efficiency.

“Our technical team is trained to tackle high-complexity projects, such as this grid-tie system. At RENOVA SRL, we not only install standalone kits; we also develop advanced solutions for state and private clients, always with the same professionalism and quality,” highlighted a company representative.

With this new reference in Cienfuegos, RENOVA SRL consolidates its reputation as a Camagüey-based company capable of executing technically demanding energy projects across the country.

RENOVA SRL – The future is now