Our experts take the first steps in the assembly of a 28 KWh solar photovoltaic system at the inflatable park of the Local Development Project Comercializadora Moderna. After arduous preparation work, which took several months, the structures and solar panels are already in place.
This system will provide uninterrupted services with positive economic, social and environmental impacts. Through the use of renewable energies, it will generate 46.93 MWh annually, with an estimated savings of 147,823.20 CUP. It will avoid the emission of 28,994 tons of carbon dioxide, as well as the burning of 12.51 tons of hydrocarbons.
